Citation
Hentschel Swen, . (2002) Optimisation of pre-harvesting surveys and post-harvesting infrastructure surveying and mapping. In: Malaysian - German sustainable forest management and conservation project : project report and papers phase I and II 1 October 1994 - 31 March 2001 v. 2. Forestry Department Peninsular Malaysia (FDPM), Kuala Lumpur Malaysia, 33 p.-.
Abstract
According to the objective and the tasks of this short-term consultancy the whole project was divided into two phases : 1. GPS/GIS based post-Harvesting infrastructure survey and mapping and 2. Topographic field survey and tree location mapping. The STCs
Download File
Full text available from:
|
Abstract
According to the objective and the tasks of this short-term consultancy the whole project was divided into two phases : 1. GPS/GIS based post-Harvesting infrastructure survey and mapping and 2. Topographic field survey and tree location mapping. The STCs
Additional Metadata
Item Type: | Book Section |
---|---|
Additional Information: | 10 ill. 1 table |
AGROVOC Term: | GEOGRAPHICAL INFORMATION SYSTEMS |
AGROVOC Term: | GLOBAL POSITIONING SYSTEMS |
AGROVOC Term: | CARTOGRAPHY |
AGROVOC Term: | TOPOGRAPHY |
AGROVOC Term: | LOGGING |
AGROVOC Term: | WOOD |
AGROVOC Term: | HARVESTING |
AGROVOC Term: | DATA COLLECTION |
AGROVOC Term: | DATA PROCESSING |
AGROVOC Term: | EVALUATION |
Geographical Term: | MALAYSIA |
Depositing User: | Mr. AFANDI ABDUL MALEK |
Last Modified: | 24 Apr 2025 00:50 |
URI: | http://webagris.upm.edu.my/id/eprint/5850 |
Actions (login required)
![]() |
View Item |