Optimisation of pre-harvesting surveys and post-harvesting infrastructure surveying and mapping


Citation

Hentschel Swen, . (2002) Optimisation of pre-harvesting surveys and post-harvesting infrastructure surveying and mapping. In: Malaysian - German sustainable forest management and conservation project : project report and papers phase I and II 1 October 1994 - 31 March 2001 v. 2. Forestry Department Peninsular Malaysia (FDPM), Kuala Lumpur Malaysia, 33 p.-.

Abstract

According to the objective and the tasks of this short-term consultancy the whole project was divided into two phases : 1. GPS/GIS based post-Harvesting infrastructure survey and mapping and 2. Topographic field survey and tree location mapping. The STCs


Download File

Full text available from:

Abstract

According to the objective and the tasks of this short-term consultancy the whole project was divided into two phases : 1. GPS/GIS based post-Harvesting infrastructure survey and mapping and 2. Topographic field survey and tree location mapping. The STCs

Additional Metadata

[error in script]
Item Type: Book Section
Additional Information: 10 ill. 1 table
AGROVOC Term: GEOGRAPHICAL INFORMATION SYSTEMS
AGROVOC Term: GLOBAL POSITIONING SYSTEMS
AGROVOC Term: CARTOGRAPHY
AGROVOC Term: TOPOGRAPHY
AGROVOC Term: LOGGING
AGROVOC Term: WOOD
AGROVOC Term: HARVESTING
AGROVOC Term: DATA COLLECTION
AGROVOC Term: DATA PROCESSING
AGROVOC Term: EVALUATION
Geographical Term: MALAYSIA
Depositing User: Mr. AFANDI ABDUL MALEK
Last Modified: 24 Apr 2025 00:50
URI: http://webagris.upm.edu.my/id/eprint/5850

Actions (login required)

View Item View Item